Next day and 2 to 3 days suggest a required-by date, skipping weekends. Over 4 days needs a date you choose.
Project
Cause and impact
Variation, NCR, or contracted works
Tick Variation, NCR, or Contracted works if this sits outside the normal call-off. QS notified is its own tick. A note is required when any box is ticked.
What is required
Tick Ancillary to choose a site product and its SKU, or Flashing for a flashing line. Plant lines need a quantity and how many weeks to hire.
Type
Description & specification
Qty
Unit
Hire weeks
Delivery
Are there any delivery restrictions?
Attachments
Optional. Add a photo, PDF, or Word document — a drawing, quote, or a picture of what is needed. Up to 6 files, 20 MB each.
Requestor sign-off
Signing emails Paul Langford and Arran Williams for sign-off and locks these fields. The reference number is assigned at sign.
Director sign-off
Purchasing
After approval, record the supplier or PO and mark the request ordered.